Projects by Investments

Download complete document (Excel) Investment.zip

Investment (€) Location Name of project Sector Potential reduction
(CO2 t/eq)
Current status
200.000 Kotor
(Montenegro)
"Lovanja" regional landfill site at Kotor - GHG reduction through biogas recovery and combustion Waste-to-energy 60.000 Pre-feasibility
250.000 Tetovo
(Macedonia)
"Edinstvo" farm in Tetovo - AWMS project for methane recovery Waste-to-energy 55.000 Pre-feasibility
250.000 Spuž
(Montenegro)
Recovery and combustion of methane from the management and treatment of manure at the "Spuž" pig farm Waste-to-energy 50.000 Pre-feasibility
250.000 Kovin
(Serbia)
Methane recovery at the “Alpis” distillery in Kovin Waste-to-energy 160.000 Pre-feasibility
260.000 Obrenovac
(Serbia)
AWMS project for methane recovery at the “Dragan Markovic“ farm in Obrenovac Waste-to-energy 84.000 Pre-feasibility
260.000 Belgrade
(Serbia)
AWMS project for methane recovery at PKB's “Nova Četvorka” buffalo farm in Belgrade Waste-to-energy 52.000 Pre-feasibility
260.000 Backa Topola
(Serbia)
AWMS project for methane recovery at PP “Pobeda” farm in Backa Topola Waste-to-energy 84.000 Pre-feasibility
280.000 Pančevo
(Serbia)
AWMS project for methane recovery at “Stari Tamiš” farm in Pančevo Waste-to-energy 115.000 Pre-feasibility
300.000 Durazzo
(Albania)
Durazzo landfill site - biogas recovery and burning Waste-to-energy 127.000 Winning company:
Gesenu Perugia (www.gesenu.it)
300.000 Elbasan
(Albania)
Elbasan landfill site - biogas recovery and burning Waste-to-energy 81.000 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Ronc, Asws, Icssea e Techne
300.000 Vlore
(Albania)
Vlore landfill site - biogas recovery and burning Waste-to-energy 65.000 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Ronc, Asws, Icssea e Techne
300.000 Kikinda
(Serbia)
Kikinda landfill site – biogas recovery and combustion Waste-to-energy 32.000 Pre-feasibility
310.000 Backa Topola
(Serbia)
AWMS project for methane recovery at PTK's “Panonija” farm in Backa Topola Waste-to-energy 112.000 Pre-feasibility
350.000 Pljevlja, Nikšić
(Montenegro)
Integrated project at Pljevlja and Nikšić landfill sites - GHG reduction through biogas recovery and combustion Waste-to-energy 128.000 Pre-feasibility
400.000 Kraljevo
(Serbia)
Kraljevo landfill site – biogas recovery and combustion Waste-to-energy 90.000 Pre-feasibility
500.000 Berane
(Montenegro)
Afforestation of degraded land Forestry 4.800 Pre-feasibility
500.000 Kragujevac
(Serbia)
Kragujevac landfill site – biogas recovery and combustion Waste-to-energy 110.000 Pre-feasibility
700.000 Novi Sad
(Serbia)
Novi Sad landfill site – biogas recovery and combustion Waste-to-energy 251.000 Pre-feasibility
750.000 Skopje
(Macedonia)
Substitution of oil with natural gas at the "Zapad" thermal plant in Skopje Fuel switching 260.000 Pre-feasibility
800.000 Stip, Kocani, Vinica
(Macedonia)
"Trestena Skala" landfill site in Stip and municipal landfill sites of Kocani and Vinica - joint project for biogas recovery and burning Waste-to-energy 156.000 Pre-feasibility
800.000 Berovo, Stip, Sveti Nikole, Vinica
(Macedonia)
"Žito Vardar" farm in Veles- AWMS project for methane recovery Waste-to-energy 220.000 Pre-feasibility
880.000 Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 Pre-feasibility
1.000.000 Kolasin
(Montenegro)
Mini hydro power station "Sjevernica 1" Power generation 27.000 Pre-feasibility
1.000.000 Cacak, Pozega, Uzice
(Serbia)
Integrated project for the reduction of GHG emissions through biogas combustion Waste-to-energy 140.000 Pre-feasibility
1.005.000 Niš
(Serbia)
Energy efficiency in street lighting in the municipality of Nis Energy efficiency 18.000 Pre-feasibility
1.300.000 Niš
(Serbia)
Niš landfill site – biogas recovery and combustion Waste-to-energy 386.000 Pre-feasibility
1.320.000 Pljevlja
(Montenegro)
Fuel switching in the industrial wood-processing sector Fuel switching 167.500 Pre-feasibility
1.460.000 Skopje
(Macedonia)
Optimisation of energy efficiency at university hospital centre of Skopje Energy efficiency 260.000 Pre-feasibility study
1.500.000 Bitola, Kocani, Kumanovo, Stip, Strumica, Vinica
(Macedonia)
Landfill gas capture and flaring at six dump sites. Combined project activity Waste-to-energy 260.000 Call of interest
1.500.000 Kokani
(Macedonia)
Biomass use Power generation 119.000 Pre-feasibility
1.700.000 Podgorica
(Montenegro)
Energy generation using biogas from Podgorica landfill site Waste-to-energy 201.500 Feasibility study
1.728.000 Cacak, Ivanjica, Pozega and Uzice
(Serbia)
Energy efficiency in street lighting in central Serbia Energy efficiency 60.000 Pre-feasibility
2.380.000 Kikinda
(Serbia)
Creation of green belts for the protection of agricultural land from the wind Forestry 36.000 Project opportunity
4.000.000 Cacak
(Serbia)
Cogeneration plants at the Cacak industrial area Energy efficiency 100.000 Pre-feasibility
4.900.000 Podgorica
(Montenegro)
Energy efficiency at the "Morača" sports centre Energy efficiency 27.000 Feasibility study
5.500.000 Zalli i Bulqizes
(Albania)
Small hydro power plant (SHPP) at Zalli i Bulqizes Power generation 118.000 Winning company:
Ronc (www.ronc.it) in parternship with Sea, Gea, Asws, Icssea, Va Tech Escher Wyss, Lachesi impianti, Tecnicaer engineering e Techne
5.640.000 Ivanjica
(Serbia)
Biomass use Power generation 160.000 Pre-feasibility
5.700.000 Tirana
(Albania)
CHP at the university hospital complex Energy efficiency 71.720 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne
6.060.000 Banato
(Serbia)
Forestation and use of woody biomass at the “Deliblatska Pescara” special nature reserve Fuel switching 167.000 Pre-feasibility
6.507.237 Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 Pre-feasibility
7.000.000 Krupac, Slano
(Montenegro)
Small-scale integrated project - Krupac and Slano Power generation 27.000 Feasibility study
7.350.000 Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 Feasibility study
7.500.000 Kucova
(Albania)
Energy efficiency in electricity distribution in the Kukova area Energy efficiency 174.000 Winning company:
Acegas-Aps (www.acegas-aps.it) in parternship with Hentec
7.500.000 Andijevica, Berane, Rozaje
(Montenegro)
Energy generation from woody biomass in northern Montenegro Power generation 136.000 Feasibility study
8.500.000 Pančevo
(Serbia)
Energy efficiency improvements at Hip-Azotara in Pančevo Energy efficiency 300.000 Feasibility study
12.000.000 Crveni Breg, Mala Bela Palanka, Vrgudinac
(Serbia)
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) Power generation 300.000 Pre-feasibility
17.500.000 Pančevo
(Serbia)
Combined heat and power (CHP) plant for the centralised heating service provided by JKP Grejanje in Pančevo Energy efficiency 600.000 Feasibility study
20.000.000 Vojvodina
(Serbia)
Use of wind power in central Serbia Power generation 460.000 Pre-feasibility
24.500.000 Kukes
(Albania)
Reforestation in Kukes area Forestry 2.084.000 Winning company:
Consorzio Abn (www.consorzioabn.it) in parternship with Confservizi, Anteco e Umbraflor
29.000.000 Jegunovce
(Macedonia)
Cdm project activity at the Silmak company Energy efficiency 115.000 General project
53.000.000 Demir Kapija, Gradsko, Negotino, Stip, Sveti Nikole, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 Pre-feasibility
64.000.000 Elbasan
(Albania)
Energy efficiency at Elbasan steelworks Energy efficiency 588.000 Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it)
1,500,000 + 300,000 Batinci (Skopje)
(Macedonia)
"Drisla" landfill site - biogas recovery and burning Waste-to-energy 671.990 Pre-feasibility
12,000,000 / 16,000,000 Berane
(Montenegro)
Integrated hydroelectric project Power generation 152.000 Pre-feasibility
2,000,000 / 2,500,000 Bansko
(Macedonia)
Use of geothermal energy at Bansko Power generation 360.000 Pre-feasibility study
3,700,000 + 500,000 Bečej
(Serbia)
AWMS project for the use of methane at the at the Pik "Bečej" farms Power generation 600.000 Pre-feasibility
500,000 / 2,500,000 Bečej, Novi Sad, Vrbas
(Serbia)
Joint hydro project on the DTD (Danube Tibisco Danube) system Power generation 226,000/296,000 Pre-feasibility
7,500,000 / 8,500,000 Sveti Nikole
(Macedonia)
Wind farm project at Sveti Nikola Power generation 178.000 Pre-feasibility
7,650,000 (steam turbine)
6,770,000 (power generation only)
Pljevlja
(Montenegro)
Energy generation from woody biomass in the municipality of Pljevlja Power generation 117.000 Pre-feasibility
Not available Dibra
(Albania)
Small hydro power plant (SHPP) at Lure 1,2,3 Power generation 216.000 Winning company:
Confservizi international (www.confservizi-international.it) in parternship with Mgm, Anteco e Italbrevetti
Not available Ballsh
(Albania)
Energy efficiency at the Ballsh refinery of Albanian Refinery Marketing Oil Company (ARMO) Energy efficiency 700.000 Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it)
Not available Tirana
(Albania)
Energy efficiency at halls of residence of Tirana University Energy efficiency 67.700 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne
Not available Kushnica, Ostrilka e Zaba
(Macedonia)
Cdm Project for three small hydro power plants Energy efficiency 2,500 tCO2eq/year and 12,500 tCO2eq for the first Kyoto Protocol implementation period. Call of interest
Not available Podgorica
(Montenegro)
CDM project activities at KAP (Podgorica aluminium plant) Energy efficiency 2.300.000 Pre-feasibility
Not available Nikšić
(Montenegro)
Energy efficiency at Nikšić steelworks Energy efficiency 460.000 Project opportunity