Projects by alphabetical order

Download complete document (Excel) alphabetical.zip

Location
Country
Name of project Sector Potential reduction
(CO2 t/eq)
Investment € Current status

Andijevica, Berane, Rozaje
(Montenegro)

Energy generation from woody biomass in northern Montenegro Power generation 136.000 7.500.000 Feasibility study
Backa Topola
(Serbia)
AWMS project for methane recovery at PTK's “Panonija” farm in Backa Topola Waste-to-energy 112.000 310.000 Pre-feasibility

Backa Topola
(Serbia)

AWMS project for methane recovery at PP “Pobeda” farm in Backa Topola Waste-to-energy 84.000 260.000 Pre-feasibility
Ballsh
(Albania)
Energy efficiency at the Ballsh refinery of Albanian Refinery Marketing Oil Company (ARMO) Energy efficiency 700.000 Not available Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it)

Banato
(Serbia)

Forestation and use of woody biomass at the “Deliblatska Pescara” special nature reserve Fuel switching 167.000 6.060.000 Pre-feasibility
Bansko
(Macedonia)
Use of geothermal energy at Bansko Power generation 360.000 2,000,000 / 2,500,000 Pre-feasibility study
Batinci (Skopje)
(Macedonia)
"Drisla" landfill site - biogas recovery and burning Waste-to-energy 671.990 1,500,000 + 300,000 Pre-feasibility

Bečej
(Serbia)

AWMS project for the use of methane at the at the Pik "Bečej" farms Power generation 600.000 3,700,000 +  500,000 Pre-feasibility

Bečej, Novi Sad, Vrbas
(Serbia)

Joint hydro project on the DTD (Danube Tibisco Danube) system Power generation 226,000/296,000 500,000 / 2,500,000 Pre-feasibility

Belgrade
(Serbia)

AWMS project for methane recovery at PKB's “Nova Četvorka” buffalo farm in Belgrade Waste-to-energy 52.000 260.000 Pre-feasibility
Berane
(Montenegro)
Integrated hydroelectric project Power generation 152.000 12,000,000 / 16,000,000 Pre-feasibility
Berane
(Montenegro)
Afforestation of degraded land Forestry 4.800 500.000 Pre-feasibility
Berane, Andijevica, Rozaje
(Montenegro)
Energy generation from woody biomass in northern Montenegro Power generation 136.000 7.500.000 Feasibility study
Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Berovo, Stip, Sveti Nikole, Vinica
(Macedonia)
"Žito Vardar" farm in Veles- AWMS project for methane recovery Waste-to-energy 220.000 800.000 Pre-feasibility
Bijelo Polje, Berane, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Bitola, Kocani, Kumanovo, Stip, Strumica, Vinica
(Macedonia)
Landfill gas capture and flaring at six dump sites. Combined project activity Waste-to-energy 260.000 1.500.000 Call of interest

Cacak
(Serbia)

Cogeneration plants at the Cacak industrial area Energy efficiency 100.000 4.000.000 Pre-feasibility

Cacak, Ivanjica, Pozega and Uzice
(Serbia)

Energy efficiency in street lighting in central Serbia Energy efficiency 60.000 1.728.000 Pre-feasibility
Cacak, Pozega, Uzice
(Serbia)
Integrated project for the reduction of GHG emissions through biogas combustion Waste-to-energy 140.000 1.000.000 Pre-feasibility
Cicevo, Tetovo
(Macedonia)
Combined awms methane recovery project Waste-to-energy 132.000 550.000 Call of interest
Crveni Breg, Mala Bela Palanka, Vrgudinac
(Serbia)
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) Power generation 300.000 12.000.000 Pre-feasibility
Danilovgrad, Berane, Bijelo Polje,  Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Demir Kapija, Gradsko, Negotino, Stip, Sveti Nikole, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Dibra
(Albania)
Small hydro power plant (SHPP) at Lure 1,2,3 Power generation 216.000 Not available Winning company:
Confservizi international (www.confservizi-international.it) in parternship with Mgm, Anteco e Italbrevetti
Durazzo
(Albania)
Durazzo landfill site - biogas recovery and burning Waste-to-energy 127.000 300.000 Winning company:
Gesenu Perugia (www.gesenu.it)
Elbasan
(Albania)
Elbasan landfill site - biogas recovery and burning Waste-to-energy 81.000 300.000 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Ronc, Asws, Icssea e Techne
Elbasan
(Albania)
Energy efficiency at Elbasan steelworks Energy efficiency 588.000 64.000.000 Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it)
Gevgelija, Bitola, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Gostivar, Bitola, Gevgelija,  Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Gradsko, Demir Kapija,  Negotino, Stip, Sveti Nikole, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Herceg Novi, Berane, Bijelo Polje, Danilovgrad, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility

Ivanjica
(Serbia)

Biomass use Power generation 160.000 5.640.000 Pre-feasibility
Ivanjica, Cacak, Pozega and Uzice 
(Serbia)
Energy efficiency in street lighting in central Serbia Energy efficiency 60.000 1.728.000 Pre-feasibility
Jegunovce
(Macedonia)
Cdm project activity at the Silmak company Energy efficiency 115.000 29.000.000 General project
Kavadarci, Bitola, Gevgelija, Gostivar,  Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Kicevo, Bitola, Gevgelija, Gostivar, Kavadarci, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Kikinda
(Serbia)
Kikinda landfill site – biogas recovery and combustion Waste-to-energy 32.000 300.000 Pre-feasibility
Kikinda
(Serbia)
Creation of green belts for the protection of agricultural land from the wind Forestry 36.000 2.380.000 Project opportunity
Kocani, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo,  Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Kocani, Stip, Vinica
(Macedonia)
"Trestena Skala" landfill site in Stip and municipal landfill sites of Kocani and Vinica - joint project for biogas recovery and burning Waste-to-energy 156.000 800.000 Pre-feasibility
Kokani
(Macedonia)
Biomass use Power generation 119.000 1.500.000 Pre-feasibility
Kolasin
(Montenegro)
Mini hydro power station "Sjevernica 1" Power generation 27.000 1.000.000 Pre-feasibility
Kotor
(Montenegro)
"Lovanja" regional landfill site at Kotor - GHG reduction through biogas recovery and combustion Waste-to-energy 60.000 200.000 Pre-feasibility
Kovin
(Serbia)
Methane recovery at the “Alpis” distillery in Kovin Waste-to-energy 160.000 250.000 Pre-feasibility
Kragujevac
(Serbia)
Kragujevac landfill site – biogas recovery and combustion Waste-to-energy 110.000 500.000 Pre-feasibility
Kraljevo
(Serbia)
Kraljevo landfill site – biogas recovery and combustion Waste-to-energy 90.000 400.000 Pre-feasibility
Krupac, Slano
(Montenegro)
Small-scale integrated project - Krupac and Slano Power generation 27.000 7.000.000 Feasibility study
Kucova
(Albania)
Energy efficiency in electricity distribution in the Kukova area Energy efficiency 174.000 7.500.000 Winning company:
Acegas-Aps (www.acegas-aps.it) in parternship with Hentec
Kukes
(Albania)
Reforestation in Kukes area Forestry 2.084.000 24.500.000 Winning company:
Consorzio Abn (www.consorzioabn.it) in parternship with Confservizi, Anteco e Umbraflor
Kumanovo, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani,  Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Kushnica, Ostrilka e Zaba
(Macedonia)
Cdm Project for three small hydro power plants Energy efficiency 2,500 tCO2eq/year and 12,500 tCO2eq for the first Kyoto Protocol implementation period. Not available Call of interest
Lijeva Rijeka, Glava Zete, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Mala Bela Palanka, Crveni Breg, Vrgudinac
(Serbia)
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) Power generation 300.000 12.000.000 Pre-feasibility
Negotino, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo,  Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Negotino, Demir Kapija, Gradsko, Stip, Sveti Nikole, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Nikšić
(Montenegro)
Energy efficiency at Nikšić steelworks Energy efficiency 460.000 Not available Project opportunity
Nikšić, Berane, Bijelo Polje, Danilovgrad, Herceg Novi,  Plav, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Nikšić, Pljevlja
(Montenegro)
Integrated project at Pljevlja and Nikšić landfill sites - GHG reduction through biogas recovery and combustion Waste-to-energy 128.000 350.000 Pre-feasibility
Niš
(Serbia)
Niš landfill site – biogas recovery and combustion Waste-to-energy 386.000 1.300.000 Pre-feasibility
Niš
(Serbia)
Energy efficiency in street lighting in the municipality of Nis Energy efficiency 18.000 1.005.000 Pre-feasibility
Novi Sad
(Serbia)
Novi Sad landfill site – biogas recovery and combustion Waste-to-energy 251.000 700.000 Pre-feasibility
Novi Sad, Bečej, Vrbas
(Serbia)
Joint hydro project on the DTD (Danube Tibisco Danube) system Power generation 226,000/296,000 500,000 / 2,500,000 Pre-feasibility
Obrenovac
(Serbia)
AWMS project for methane recovery at the “Dragan Markovic“ farm in Obrenovac Waste-to-energy 84.000 260.000 Pre-feasibility
Ohrid, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino,  Prilep, Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Pančevo
(Serbia)
AWMS project for methane recovery at “Stari Tamiš” farm in Pančevo Waste-to-energy 115.000 280.000 Pre-feasibility
Pančevo
(Serbia)
Energy efficiency improvements at Hip-Azotara in Pančevo Energy efficiency 300.000 8.500.000 Feasibility study
Pančevo
(Serbia)
Combined heat and power (CHP) plant for the centralised heating service provided by JKP Grejanje in Pančevo Energy efficiency 600.000 17.500.000 Feasibility study
Plav, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Pljevlja, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Pljevlja
(Montenegro)
Energy generation from woody biomass in the municipality of Pljevlja Power generation 117.000 7,650,000 (steam turbine) 6,770,000 (power generation only) Pre-feasibility
Pljevlja
(Montenegro)
Fuel switching in the industrial wood-processing sector Fuel switching 167.500 1.320.000 Pre-feasibility
Pljevlja, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Tivat, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Pljevlja, Nikšić
(Montenegro)
Integrated project at Pljevlja and Nikšić landfill sites - GHG reduction through biogas recovery and combustion Waste-to-energy 128.000 350.000 Pre-feasibility
Podgor, Glava Zete, Lijeva Rijeka, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Podgorica
(Montenegro)
Energy generation using biogas from Podgorica landfill site Waste-to-energy 201.500 1.700.000 Feasibility study
Podgorica
(Montenegro)
Energy efficiency at the "Morača" sports centre Energy efficiency 27.000 4.900.000 Feasibility study
Podgorica
(Montenegro)
CDM project activities at KAP (Podgorica aluminium plant) Energy efficiency 2.300.000 Not available Pre-feasibility
Pozega, Cacak, Ivanjica, Uzice
(Serbia)
Energy efficiency in street lighting in central Serbia Energy efficiency 60.000 1.728.000 Pre-feasibility
Pozega, Cacak, Uzice
(Serbia)
Integrated project for the reduction of GHG emissions through biogas combustion Waste-to-energy 140.000 1.000.000 Pre-feasibility
Prilep, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid,  Resen, Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Resen, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep,  Stip, Struga, Strumica, Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Rijeka Crnojevica, Glava Zete, Lijeva Rijeka, Podgor,  Rijeka Musovica, Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Rijeka Musovica, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica,  Savnik, Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Rozaje, Andijevica, Berane
(Montenegro)
Energy generation from woody biomass in northern Montenegro Power generation 136.000 7.500.000 Feasibility study
Savnik, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica,  Slap Zete
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Skopje
(Macedonia)
Optimisation of energy efficiency at university hospital centre of Skopje Energy efficiency 260.000 1.460.000 Pre-feasibility study
Skopje
(Macedonia)
Substitution of oil with natural gas at the "Zapad" thermal plant in Skopje Fuel switching 260.000 750.000 Pre-feasibility
Slano, Krupac
(Montenegro)
Small-scale integrated project - Krupac and Slano Power generation 27.000 7.000.000 Feasibility study
Slap Zete, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik
(Montenegro)
Revamping of mini-hydro power stations Power generation 64.200 7.350.000 Feasibility study
Spuž
(Montenegro)
Recovery and combustion of methane from the management and treatment of manure at the "Spuž" pig farm Waste-to-energy 50.000 250.000 Pre-feasibility
Stip, Berovo, Sveti Nikole, Vinica
(Macedonia)
"Žito Vardar" farm in Veles- AWMS project for methane recovery Waste-to-energy 220.000 800.000 Pre-feasibility
Stip, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen,  Struga, Strumica, Tetovo, Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Stip, Demir Kapija, Gradsko, Negotino, Sveti Nikole, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Struga, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip,  Strumica, Tetovo, Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Strumica, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga,  Tetovo,  Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Sveti Nikole
(Macedonia)
Wind farm project at Sveti Nikola Power generation 178.000 7,500,000 / 8,500,000 Pre-feasibility
Sveti Nikole, Berovo, Stip, Vinica
(Macedonia)
"Žito Vardar" farm in Veles- AWMS project for methane recovery Waste-to-energy 220.000 800.000 Pre-feasibility
Sveti Nikole, Demir Kapija, Gradsko, Negotino, Stip, Veles
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Tetovo, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Veles
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Tirana
(Albania)
CHP at the university hospital complex Energy efficiency 71.720 5.700.000 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne
Tirana
(Albania)
Energy efficiency at halls of residence of Tirana University Energy efficiency 67.700 Not available Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne
Tivat, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Ulcinj
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Ulcinj, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat
(Montenegro)
Energy efficiency for public lighting Energy efficiency 24.000 880.000 Pre-feasibility
Uzice, Cacak, Ivanjica and Pozega
(Serbia)
Energy efficiency in street lighting in central Serbia Energy efficiency 60.000 1.728.000 Pre-feasibility
Uzice, Cacak, Pozega
(Serbia)
Integrated project for the reduction of GHG emissions through biogas combustion Waste-to-energy 140.000 1.000.000 Pre-feasibility
Veles, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo
(Macedonia)
Energy efficiency for street lighting in Macedonia Energy efficiency 145.000 6.507.237 Pre-feasibility
Veles, Demir Kapija, Gradsko, Negotino, Stip, Sveti Nikole
(Macedonia)
Afforestation in central Macedonia Forestry 5.670.000 53.000.000 Pre-feasibility
Vinica, Berovo, Stip, Sveti Nikole
(Macedonia)
"Žito Vardar" farm in Veles- AWMS project for methane recovery Waste-to-energy 220.000 800.000 Pre-feasibility
Vinica, Stip, Kocani
(Macedonia)
"Trestena Skala" landfill site in Stip and municipal landfill sites of Kocani and Vinica - joint project for biogas recovery and burning Waste-to-energy 156.000 800.000 Pre-feasibility
Vlore
(Albania)
Vlore landfill site - biogas recovery and burning Waste-to-energy 65.000 300.000 Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne
Vojvodina
(Serbia)
Use of wind power in central Serbia Power generation 460.000 20.000.000 Pre-feasibility
Vrbas, Bečej, Novi Sad
(Serbia)
Joint hydro project on the DTD (Danube Tibisco Danube) system Power generation 226,000/296,000 500,000 / 2,500,000 Pre-feasibility
Vrgudinac, Crveni Breg, Mala Bela Palanka
(Serbia)
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) Power generation 300.000 12.000.000 Pre-feasibility
Zalli i Bulqizes
(Albania)
Small hydro power plant (SHPP) at Zalli i Bulqizes Power generation 118.000 5.500.000 Winning company:
Ronc (www.ronc.it) in parternship with Sea, Gea, Asws, Icssea, Va Tech Escher Wyss, Lachesi impianti, Tecnicaer engineering e Techne