Projects by alphabetical order
Download complete document (Excel) alphabetical.zip
Location
Country |
Name of project |
Sector |
Potential reduction
(CO2 t/eq) |
Investment € |
Current status |
Andijevica, Berane, Rozaje
(Montenegro) |
Energy generation from woody biomass in northern Montenegro |
Power generation |
136.000 |
7.500.000 |
Feasibility study |
Backa Topola
(Serbia) |
AWMS project for methane recovery at PTK's “Panonija” farm in Backa Topola |
Waste-to-energy |
112.000 |
310.000 |
Pre-feasibility |
Backa Topola
(Serbia) |
AWMS project for methane recovery at PP “Pobeda” farm in Backa Topola |
Waste-to-energy |
84.000 |
260.000 |
Pre-feasibility |
Ballsh
(Albania) |
Energy efficiency at the Ballsh refinery of Albanian Refinery Marketing Oil Company (ARMO) |
Energy efficiency |
700.000 |
Not available |
Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it) |
Banato
(Serbia) |
Forestation and use of woody biomass at the “Deliblatska Pescara” special nature reserve |
Fuel switching |
167.000 |
6.060.000 |
Pre-feasibility |
Bansko
(Macedonia) |
Use of geothermal energy at Bansko |
Power generation |
360.000 |
2,000,000 / 2,500,000 |
Pre-feasibility study |
Batinci (Skopje)
(Macedonia) |
"Drisla" landfill site - biogas recovery and burning |
Waste-to-energy |
671.990 |
1,500,000 + 300,000 |
Pre-feasibility |
Bečej
(Serbia) |
AWMS project for the use of methane at the at the Pik "Bečej" farms |
Power generation |
600.000 |
3,700,000 + 500,000 |
Pre-feasibility |
Bečej, Novi Sad, Vrbas
(Serbia) |
Joint hydro project on the DTD (Danube Tibisco Danube) system |
Power generation |
226,000/296,000 |
500,000 / 2,500,000 |
Pre-feasibility |
Belgrade
(Serbia) |
AWMS project for methane recovery at PKB's “Nova Četvorka” buffalo farm in Belgrade |
Waste-to-energy |
52.000 |
260.000 |
Pre-feasibility |
Berane
(Montenegro) |
Integrated hydroelectric project |
Power generation |
152.000 |
12,000,000 / 16,000,000 |
Pre-feasibility |
Berane
(Montenegro) |
Afforestation of degraded land |
Forestry |
4.800 |
500.000 |
Pre-feasibility |
Berane, Andijevica, Rozaje
(Montenegro) |
Energy generation from woody biomass in northern Montenegro |
Power generation |
136.000 |
7.500.000 |
Feasibility study |
Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Berovo, Stip, Sveti Nikole, Vinica
(Macedonia) |
"Žito Vardar" farm in Veles- AWMS project for methane recovery |
Waste-to-energy |
220.000 |
800.000 |
Pre-feasibility |
Bijelo Polje, Berane, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Bitola, Kocani, Kumanovo, Stip, Strumica, Vinica
(Macedonia) |
Landfill gas capture and flaring at six dump sites. Combined project activity |
Waste-to-energy |
260.000 |
1.500.000 |
Call of interest |
Cacak
(Serbia) |
Cogeneration plants at the Cacak industrial area |
Energy efficiency |
100.000 |
4.000.000 |
Pre-feasibility |
Cacak, Ivanjica, Pozega and Uzice
(Serbia) |
Energy efficiency in street lighting in central Serbia |
Energy efficiency |
60.000 |
1.728.000 |
Pre-feasibility |
Cacak, Pozega, Uzice
(Serbia) |
Integrated project for the reduction of GHG emissions through biogas combustion |
Waste-to-energy |
140.000 |
1.000.000 |
Pre-feasibility |
Cicevo, Tetovo
(Macedonia) |
Combined awms methane recovery project |
Waste-to-energy |
132.000 |
550.000 |
Call of interest |
Crveni Breg, Mala Bela Palanka, Vrgudinac
(Serbia) |
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) |
Power generation |
300.000 |
12.000.000 |
Pre-feasibility |
Danilovgrad, Berane, Bijelo Polje, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Demir Kapija, Gradsko, Negotino, Stip, Sveti Nikole, Veles
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Dibra
(Albania) |
Small hydro power plant (SHPP) at Lure 1,2,3 |
Power generation |
216.000 |
Not available |
Winning company:
Confservizi international (www.confservizi-international.it) in parternship with Mgm, Anteco e Italbrevetti |
Durazzo
(Albania) |
Durazzo landfill site - biogas recovery and burning |
Waste-to-energy |
127.000 |
300.000 |
Winning company:
Gesenu Perugia (www.gesenu.it) |
Elbasan
(Albania) |
Elbasan landfill site - biogas recovery and burning |
Waste-to-energy |
81.000 |
300.000 |
Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Ronc, Asws, Icssea e Techne |
Elbasan
(Albania) |
Energy efficiency at Elbasan steelworks |
Energy efficiency |
588.000 |
64.000.000 |
Winning company:Mwh Ambiente e sicurezza (www.mwh-ambienteesicurezza.it) |
Gevgelija, Bitola, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Gostivar, Bitola, Gevgelija, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Gradsko, Demir Kapija, Negotino, Stip, Sveti Nikole, Veles
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Herceg Novi, Berane, Bijelo Polje, Danilovgrad, Nikšić, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Ivanjica
(Serbia) |
Biomass use |
Power generation |
160.000 |
5.640.000 |
Pre-feasibility |
Ivanjica, Cacak, Pozega and Uzice
(Serbia) |
Energy efficiency in street lighting in central Serbia |
Energy efficiency |
60.000 |
1.728.000 |
Pre-feasibility |
Jegunovce
(Macedonia) |
Cdm project activity at the Silmak company |
Energy efficiency |
115.000 |
29.000.000 |
General project |
Kavadarci, Bitola, Gevgelija, Gostivar, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Kicevo, Bitola, Gevgelija, Gostivar, Kavadarci, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Kikinda
(Serbia) |
Kikinda landfill site – biogas recovery and combustion |
Waste-to-energy |
32.000 |
300.000 |
Pre-feasibility |
Kikinda
(Serbia) |
Creation of green belts for the protection of agricultural land from the wind |
Forestry |
36.000 |
2.380.000 |
Project opportunity |
Kocani, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Kocani, Stip, Vinica
(Macedonia) |
"Trestena Skala" landfill site in Stip and municipal landfill sites of Kocani and Vinica - joint project for biogas recovery and burning |
Waste-to-energy |
156.000 |
800.000 |
Pre-feasibility |
Kokani
(Macedonia) |
Biomass use |
Power generation |
119.000 |
1.500.000 |
Pre-feasibility |
Kolasin
(Montenegro) |
Mini hydro power station "Sjevernica 1" |
Power generation |
27.000 |
1.000.000 |
Pre-feasibility |
Kotor
(Montenegro) |
"Lovanja" regional landfill site at Kotor - GHG reduction through biogas recovery and combustion |
Waste-to-energy |
60.000 |
200.000 |
Pre-feasibility |
Kovin
(Serbia) |
Methane recovery at the “Alpis” distillery in Kovin |
Waste-to-energy |
160.000 |
250.000 |
Pre-feasibility |
Kragujevac
(Serbia) |
Kragujevac landfill site – biogas recovery and combustion |
Waste-to-energy |
110.000 |
500.000 |
Pre-feasibility |
Kraljevo
(Serbia) |
Kraljevo landfill site – biogas recovery and combustion |
Waste-to-energy |
90.000 |
400.000 |
Pre-feasibility |
Krupac, Slano
(Montenegro) |
Small-scale integrated project - Krupac and Slano |
Power generation |
27.000 |
7.000.000 |
Feasibility study |
Kucova
(Albania) |
Energy efficiency in electricity distribution in the Kukova area |
Energy efficiency |
174.000 |
7.500.000 |
Winning company:
Acegas-Aps (www.acegas-aps.it) in parternship with Hentec |
Kukes
(Albania) |
Reforestation in Kukes area |
Forestry |
2.084.000 |
24.500.000 |
Winning company:
Consorzio Abn (www.consorzioabn.it) in parternship with Confservizi, Anteco e Umbraflor |
Kumanovo, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Kushnica, Ostrilka e Zaba
(Macedonia) |
Cdm Project for three small hydro power plants |
Energy efficiency |
2,500 tCO2eq/year and 12,500 tCO2eq for the first Kyoto Protocol implementation period. |
Not available |
Call of interest |
Lijeva Rijeka, Glava Zete, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Mala Bela Palanka, Crveni Breg, Vrgudinac
(Serbia) |
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) |
Power generation |
300.000 |
12.000.000 |
Pre-feasibility |
Negotino, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Negotino, Demir Kapija, Gradsko, Stip, Sveti Nikole, Veles
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Nikšić
(Montenegro) |
Energy efficiency at Nikšić steelworks |
Energy efficiency |
460.000 |
Not available |
Project opportunity |
Nikšić, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Plav, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Nikšić, Pljevlja
(Montenegro) |
Integrated project at Pljevlja and Nikšić landfill sites - GHG reduction through biogas recovery and combustion |
Waste-to-energy |
128.000 |
350.000 |
Pre-feasibility |
Niš
(Serbia) |
Niš landfill site – biogas recovery and combustion |
Waste-to-energy |
386.000 |
1.300.000 |
Pre-feasibility |
Niš
(Serbia) |
Energy efficiency in street lighting in the municipality of Nis |
Energy efficiency |
18.000 |
1.005.000 |
Pre-feasibility |
Novi Sad
(Serbia) |
Novi Sad landfill site – biogas recovery and combustion |
Waste-to-energy |
251.000 |
700.000 |
Pre-feasibility |
Novi Sad, Bečej, Vrbas
(Serbia) |
Joint hydro project on the DTD (Danube Tibisco Danube) system |
Power generation |
226,000/296,000 |
500,000 / 2,500,000 |
Pre-feasibility |
Obrenovac
(Serbia) |
AWMS project for methane recovery at the “Dragan Markovic“ farm in Obrenovac |
Waste-to-energy |
84.000 |
260.000 |
Pre-feasibility |
Ohrid, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Prilep, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Pančevo
(Serbia) |
AWMS project for methane recovery at “Stari Tamiš” farm in Pančevo |
Waste-to-energy |
115.000 |
280.000 |
Pre-feasibility |
Pančevo
(Serbia) |
Energy efficiency improvements at Hip-Azotara in Pančevo |
Energy efficiency |
300.000 |
8.500.000 |
Feasibility study |
Pančevo
(Serbia) |
Combined heat and power (CHP) plant for the centralised heating service provided by JKP Grejanje in Pančevo |
Energy efficiency |
600.000 |
17.500.000 |
Feasibility study |
Plav, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Pljevlja, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Pljevlja
(Montenegro) |
Energy generation from woody biomass in the municipality of Pljevlja |
Power generation |
117.000 |
7,650,000 (steam turbine) 6,770,000 (power generation only) |
Pre-feasibility |
Pljevlja
(Montenegro) |
Fuel switching in the industrial wood-processing sector |
Fuel switching |
167.500 |
1.320.000 |
Pre-feasibility |
Pljevlja, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Tivat, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Pljevlja, Nikšić
(Montenegro) |
Integrated project at Pljevlja and Nikšić landfill sites - GHG reduction through biogas recovery and combustion |
Waste-to-energy |
128.000 |
350.000 |
Pre-feasibility |
Podgor, Glava Zete, Lijeva Rijeka, Rijeka Crnojevica, Rijeka Musovica, Savnik, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Podgorica
(Montenegro) |
Energy generation using biogas from Podgorica landfill site |
Waste-to-energy |
201.500 |
1.700.000 |
Feasibility study |
Podgorica
(Montenegro) |
Energy efficiency at the "Morača" sports centre |
Energy efficiency |
27.000 |
4.900.000 |
Feasibility study |
Podgorica
(Montenegro) |
CDM project activities at KAP (Podgorica aluminium plant) |
Energy efficiency |
2.300.000 |
Not available |
Pre-feasibility |
Pozega, Cacak, Ivanjica, Uzice
(Serbia) |
Energy efficiency in street lighting in central Serbia |
Energy efficiency |
60.000 |
1.728.000 |
Pre-feasibility |
Pozega, Cacak, Uzice
(Serbia) |
Integrated project for the reduction of GHG emissions through biogas combustion |
Waste-to-energy |
140.000 |
1.000.000 |
Pre-feasibility |
Prilep, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Resen, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Resen, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Stip, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Rijeka Crnojevica, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Musovica, Savnik, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Rijeka Musovica, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Savnik, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Rozaje, Andijevica, Berane
(Montenegro) |
Energy generation from woody biomass in northern Montenegro |
Power generation |
136.000 |
7.500.000 |
Feasibility study |
Savnik, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Slap Zete
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Skopje
(Macedonia) |
Optimisation of energy efficiency at university hospital centre of Skopje |
Energy efficiency |
260.000 |
1.460.000 |
Pre-feasibility study |
Skopje
(Macedonia) |
Substitution of oil with natural gas at the "Zapad" thermal plant in Skopje |
Fuel switching |
260.000 |
750.000 |
Pre-feasibility |
Slano, Krupac
(Montenegro) |
Small-scale integrated project - Krupac and Slano |
Power generation |
27.000 |
7.000.000 |
Feasibility study |
Slap Zete, Glava Zete, Lijeva Rijeka, Podgor, Rijeka Crnojevica, Rijeka Musovica, Savnik
(Montenegro) |
Revamping of mini-hydro power stations |
Power generation |
64.200 |
7.350.000 |
Feasibility study |
Spuž
(Montenegro) |
Recovery and combustion of methane from the management and treatment of manure at the "Spuž" pig farm |
Waste-to-energy |
50.000 |
250.000 |
Pre-feasibility |
Stip, Berovo, Sveti Nikole, Vinica
(Macedonia) |
"Žito Vardar" farm in Veles- AWMS project for methane recovery |
Waste-to-energy |
220.000 |
800.000 |
Pre-feasibility |
Stip, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Struga, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Stip, Demir Kapija, Gradsko, Negotino, Sveti Nikole, Veles
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Struga, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Strumica, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Strumica, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Tetovo, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Sveti Nikole
(Macedonia) |
Wind farm project at Sveti Nikola |
Power generation |
178.000 |
7,500,000 / 8,500,000 |
Pre-feasibility |
Sveti Nikole, Berovo, Stip, Vinica
(Macedonia) |
"Žito Vardar" farm in Veles- AWMS project for methane recovery |
Waste-to-energy |
220.000 |
800.000 |
Pre-feasibility |
Sveti Nikole, Demir Kapija, Gradsko, Negotino, Stip, Veles
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Tetovo, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Veles
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Tirana
(Albania) |
CHP at the university hospital complex |
Energy efficiency |
71.720 |
5.700.000 |
Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne |
Tirana
(Albania) |
Energy efficiency at halls of residence of Tirana University |
Energy efficiency |
67.700 |
Not available |
Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne |
Tivat, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Ulcinj
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Ulcinj, Berane, Bijelo Polje, Danilovgrad, Herceg Novi, Nikšić, Plav, Pljevlja, Tivat
(Montenegro) |
Energy efficiency for public lighting |
Energy efficiency |
24.000 |
880.000 |
Pre-feasibility |
Uzice, Cacak, Ivanjica and Pozega
(Serbia) |
Energy efficiency in street lighting in central Serbia |
Energy efficiency |
60.000 |
1.728.000 |
Pre-feasibility |
Uzice, Cacak, Pozega
(Serbia) |
Integrated project for the reduction of GHG emissions through biogas combustion |
Waste-to-energy |
140.000 |
1.000.000 |
Pre-feasibility |
Veles, Bitola, Gevgelija, Gostivar, Kavadarci, Kicevo, Kocani, Kumanovo, Negotino, Ohrid, Prilep, Resen, Stip, Struga, Strumica, Tetovo
(Macedonia) |
Energy efficiency for street lighting in Macedonia |
Energy efficiency |
145.000 |
6.507.237 |
Pre-feasibility |
Veles, Demir Kapija, Gradsko, Negotino, Stip, Sveti Nikole
(Macedonia) |
Afforestation in central Macedonia |
Forestry |
5.670.000 |
53.000.000 |
Pre-feasibility |
Vinica, Berovo, Stip, Sveti Nikole
(Macedonia) |
"Žito Vardar" farm in Veles- AWMS project for methane recovery |
Waste-to-energy |
220.000 |
800.000 |
Pre-feasibility |
Vinica, Stip, Kocani
(Macedonia) |
"Trestena Skala" landfill site in Stip and municipal landfill sites of Kocani and Vinica - joint project for biogas recovery and burning |
Waste-to-energy |
156.000 |
800.000 |
Pre-feasibility |
Vlore
(Albania) |
Vlore landfill site - biogas recovery and burning |
Waste-to-energy |
65.000 |
300.000 |
Winning company:
Sea – Società energetica aostana (www.seaenergia.com) in parternship with Lachesi impianti, Tecnicaer engineering, Icssea e Techne |
Vojvodina
(Serbia) |
Use of wind power in central Serbia |
Power generation |
460.000 |
20.000.000 |
Pre-feasibility |
Vrbas, Bečej, Novi Sad
(Serbia) |
Joint hydro project on the DTD (Danube Tibisco Danube) system |
Power generation |
226,000/296,000 |
500,000 / 2,500,000 |
Pre-feasibility |
Vrgudinac, Crveni Breg, Mala Bela Palanka
(Serbia) |
Mini-hydro power plants of Crveni Breg, Mala Bela Palanka and Vrgudinac (joint project) |
Power generation |
300.000 |
12.000.000 |
Pre-feasibility |
Zalli i Bulqizes
(Albania) |
Small hydro power plant (SHPP) at Zalli i Bulqizes |
Power generation |
118.000 |
5.500.000 |
Winning company:
Ronc (www.ronc.it) in parternship with Sea, Gea, Asws, Icssea, Va Tech Escher Wyss, Lachesi impianti, Tecnicaer engineering e Techne |
|
|